studio J2's Residential Work Zen House Phase II < Back to Residential Zen House Phase II Second-floor renovation includes enlarging the stair landing, providing a new laundry room, re-designing the children’s bathroom, and the master bedroom and bathroom. Second Floor LandingChildren's Bathroom entryChildren's BathroomMaster BathroomMaster BathroomMaster BathroomMaster BathroomMaster Bedroom Master Bedroom Laundry Room + Master closet Back to Residential